Skip to content
Drain Rock 3/4", photographed at the BALM yard

Drain Rock 3/4"

$74.99 / cubic yardCall for availabilitySKU BALM-AGG-002

Drain Rock 3/4" is a drain rock, sold by the cubic yard, with half cubic yard and quarter cubic yard options, for pickup at our Richmond, CA yard or delivery across the Bay Area.

Sold
by the cubic yard
1 yd³ covers
~108 sq ft at 3″
Weight
~1.4 t per yd³
Delivery
$65 within 20 mi (*Conditions apply.)
Unit of sale
cubic yard

Price

$74.99 / cubic yard

1 × $74.99 = $74.99, plus tax and delivery

WARNING: This product can expose you to chemicals including crystalline silica (airborne particles of respirable size), which is known to the State of California to cause cancer. For more information go to www.P65Warnings.ca.gov.

Work out how much Drain Rock 3/4" you need

How much Drain Rock 3/4" do I need?

Set up for this material. Results update as you type.

Shape of the area
Depth (inches)

Drainage trenches and French drains are usually 6–12 in of rock around the pipe.

You'll need about

Enter your measurements to see the amount.

Enter your 5-digit ZIP for your delivery tier.

Request a quote

Estimates use typical figures for loose material; the yard confirms the exact amount and price.

About Drain Rock 3/4"

Drain Rock 3/4" is a drain rock, sold by the cubic yard at Bay Area Landscaping Materials in Richmond, CA.

Drain rock is clean crushed stone with the fines screened out, so water passes through it freely. It is the usual fill for French drains, the backfill behind retaining walls and the bed around perforated pipe.

Common uses

  • French drains
  • Backfill behind retaining walls
  • Around perforated drain pipe
  • Drainage layers under planters

How far a cubic yard goes

A cubic yard is 27 cubic feet. Approximate coverage, before settling or compaction:

Depth1 cubic yard covers
2 inchesabout 162 sq ft
3 inchesabout 108 sq ft

Work out your exact yardage with the calculator above

Product details

SKU
BALM-AGG-002
Category
Bulk Materials › Construction Aggregates
Unit of sale
Cubic Yard
Also sold by
Half Cubic Yard, Quarter Cubic Yard
Available at
400 W Gertrude Ave, Richmond, CA

Questions about Drain Rock 3/4"

Can I pick up Drain Rock 3/4", or have it delivered?

Both. Drain Rock 3/4" is sold by the cubic yard, half cubic yard or quarter cubic yard. Pick it up at 400 W Gertrude Ave, Richmond, CA 94801 (open Monday–Friday 7:00 AM – 5:00 PM and Saturday–Sunday 9:00 AM – 3:30 PM), where we load it into your truck or trailer, or have it delivered across the Bay Area, seven days a week, within about 70 miles of the yard. Delivery is a flat $65 within 20 miles of the yard for orders under 5 cubic yards of material. *Conditions apply. Further out, or 5 cubic yards and up, call for a delivery quote. The minimum bulk delivery is 1 cubic yard; smaller amounts can be picked up.

How much area does a cubic yard of Drain Rock 3/4" cover?

One cubic yard is 27 cubic feet. Spread 2 inches deep it covers about 162 square feet, and 3 inches deep about 108 square feet. Half and quarter cubic yards are also available.

How much does Drain Rock 3/4" cost?

$74.99 / cubic yard, $44.50 / half cubic yard, $25.75 / quarter cubic yard at our Richmond yard, before sales tax. Delivery is priced by distance and load: request a quote online or call (510) 860-4461 and we will confirm the total.

Ready to order Drain Rock 3/4"?

Tell us the quantity and where it's going, and we'll come back with a price for pickup or delivery.